loader

Contact us:

(+4) 0744 350 499

email
whatsapp
skype: exegens
Strategic KAIZEN

 

 

 

 

Takt Profit

Architecting Flow for Profit

 

KAIZENshiro Budget

Enterprise Resilience, Customer Value.

 

 

Synchronous Profitable Operations

Financially‑Disciplined Profit Flow

 

 

 

  • Industries
    • Automotive & Assembly
    • Food & beverage
  • Capabilities
    • Strategic KAIZEN Capabilities
    • The Architecture of Advantage
    • Dual Profitability
    • Resilience and Value
    • Synchronous Profitability
    • Architecting Flow for Profit
    • Project: Strategic Kaizen
    • Results
  • Training
    • Training & Workshop: 10 steps
    • Training & Workshop
    • Training Strategic Kaizen
    • Training Controlling
    • Strategic Kaizen Manager
  • Insights
    • Blog
    • Frequently Asked Questions
    • Podcast
    • Books
    • Newsletter
  • About Us
    • About Us
    • Identity
    • Method
    • Impact
  • Contact
  • EnglishEnglish

setup

  • Home/
  • setup
  • 14_2020
    19
    Feb

    Challenges in reducing total lead time

    Miscellaneous
    By Dr. Alin Posteucă

    From the perspective of Total Lead Time, any company mainly wants to have a system that:

    is able to comply with the delivery terms assumed;
    continuously maintains an optimal stock level;
    continuously reduces total lead time (especially in the production area – it’s handy);
    reduces the number of operations an […]

    READ MORE
  • OEE and Kaizen for Setup
    4
    Feb

    Set-up standardization and its impact on OEE

    Productivity
    By Dr. Alin Posteucă

    Companies are aware that production planning has to take into account each type of set-up time.
    Practitioners admit that they need set-up time standardization (SOP for set-up) for: (1) increasing flexibility and (2) continually improving set-up time. Sometimes, it is difficult for them to convince managers that for this […]

    READ MORE
  • 07_02_05
    20
    Nov

    Set-up: improvement and production planning

    Productivity
    By Dr. Alin Posteucă
    No Comments Yet

    Every manufacturing company must do the set-up (changeover) activity. Without this activity the work cannot be carried out and the flexibility imposed by the clients’ requests cannot be ensured.
    But I often meet companies that do not have a standard time for each type of set-up or at least for the most frequent, co […]

    READ MORE
About Exegens

Strategic Kaizen. Takt Profit.

 

 

Capabilities

Architecture. Frameworks.

FAQ – Strategic Kaizen

Principles. Mechanisms. Execution.

SEARCH
Copyright © 2005–2026 Exegens® | Data Protection
  • en English
  • ro Romana