Films · B · Proof · Exegens®
B · Proof.
The Numbers. With the Source.
Book · figure · page.

A claim is only as strong as its source. Every number in these films comes from the published volumes of Strategic Kaizen — and every film names the book, the figure and the page, so that any executive can check every number.

FormatThe numbers · never without their source
SourceThe Five Volumes · Routledge · CRC Press
AuthorDr. Alin Posteucă · Originator of Strategic Kaizen and Takt Profit
NextC · Project · the profit, delivered
The numbersWhat losses and waste really cost
The sourceBook · figure · page, on every film
Check it yourselfEvery claim can be verified in the volumes
B · 01 · Latest2 min 8 s
B · 01 · 2 min 8 s The Proof · Heavy Industry · Metal Products
Two plants. Two bottlenecks.
The profit written in the budget first.
Machine shop · assembly line 5, operation 16
Dr. Alin Posteucă

In heavy industry the bottleneck is usually a machine — and the reflex is to buy a faster one. Strategic Kaizen asks first what the losses and waste at that machine cost, and writes the profit in the KAIZENshiro budget before anyone touches it. Two projects, two plants, the cost of both: insignificant.

31 → 23 sequipment ZZ · 2,160 → 2,911 pieces a day
$875,000a quarter of the $3.5M goal · fully met · four weeks
30 → 13 soperation 16 · 1,116 → 2,690 per shift · $34,500 · seven weeks
Book
Manufacturing Cost Policy Deployment (MCPD): Profitability Scenarios · Routledge, 2019
Project 3
Machine shop, metal products · pp. 192–197
Project 11
Line 5, operation 16, metal products · pp. 256–261, Figure 7.9