Actual Cycle Time

 22/11/2019
By Dr. Alin Posteucă

Should an equipment/line that has significant variations between the standard and the actual cycle time be declared in a breakdown state? (standard cycle time lower than actual cycle time).

Sometimes I have this discussion in factories. Do you have standard cycle time on equipment/line? Do you measure the differences between standard and actual cycle time? Do you have such discussions in your company?

As it is known, the lack of recognition of the problem is the biggest problem.

Source: Alin Posteucă on LinkedIn

Share:
Strategic productivity and profitability consultant and researcher, Alin Posteucă, Ph.D., Ph.D. is transforming the way companies approach their strategic transformation. With over 20 years of management consulting experience, Posteucă has created effective concepts such as Strategic Kaizen, Takt Profit, KAIZENshiro Budgets and Costing. His research on production flow has led to innovative breakthroughs in strategic and operational productivity improvement.

Posteucă's investigation into typologies of losses and waste has identified feasible improvements that can achieve the ideal state of production flow, known as Synchronous Profitable Operations (SPO). His Takt Profit model allows the optimization of production planning, transforming profit per minute into objectives for strategic improvements achieved through Strategic Kaizen projects.

Posteucă's research has led to increased effectiveness in strategic improvements and has set the stage for future productivity in the world of manufacturing technology. He is laureate of the Romanian Academy of the "Traian Vuia" Prize, the highest scientific prize in Romania.